The Township's Public Works Department manages a variety of construction projects for current and future improvements on Township streets, sidewalks and bridges. Select your project of interest below to learn more.

Status: Construction - Ongoing (Updated March 16, 2026)

Contractor: Baiocco Construction Corp.

Inspection: Urban & Environmental Management Inc.

Description:

St. Ann’s Road Reconstruction involves the relocation of Enbridge Gas utilities, reconstruction of St. Ann’s Road from Twenty Mile Road to Regional Road 20, the rehabilitation of the North Creek Bridge, improvements to the railway crossing, sidewalk/pedestrian safety, and storm sewers / drainage improvements.

Approved Budget: $4.7 million

Construction Contract Value: $3.0 million

Activity:

  • Storm sewer installation from bridge to Twenty Mile Rd.

Traffic Disruptions:

  • St. Ann's Rd is closed to local traffic only from Twenty Mile Rd. to the bridge.

Status: Completed.

Contractor: Kon-Strutt Construction

Description:

This contract encompasses the provision of all labour, materials, and equipment necessary for the completion of the following:

  • Various Hot Mix Asphalt Spot Repair Locations, approximately 4000m2 each contract year, locations will be provided in May 2025/2026 once the road network has been assessed.
    • Asphalt Milling, Supply and Placement of Hot Mix Asphalt
    • Provisional Items including Base Repairs, Additional Asphalt Milling above the 4000m², Winter Season Milling, Winter Season Supply and Placement of Hot Mix Asphalt.

Approved Budget: $230,000.00

Contract Value: $420,000.00

Activity: None

Traffic Disruptions: None

Status: Work completed. Under 1 year Maintenance. (Updated July 16, 2025)

Contractor: GIP Paving Ltd.

Description:

Rehabilitation of Silverdale Road:

  • from Twenty Road (RR 69) to Fifteen Road

    • Mill 50mm, then pulverize 150mm, blending 40mm of Gran A, and grading, remove & replace a short section of mountable concrete curb, add 20mm HL2 skim coat to bridge deck, place 100mm of hot mix asphalt, granular shouldering, driveway reinstatements, and line painting,

  • from Fifteen Road to RR 20

    • Mill 40mm, base repairs, spot repairs/padding with 50mm asphalt, pave 40mm surface hot mix, line painting.

Approved Budget: $1.2 million

Contract Value: $975,000.00

Activity: None.

Traffic Disruptions: None.

Status: Completed. Under 1 Year Maintenance (Updated July 16, 2025)

Contractor: Catalina Excavating Ltd.

Consultant: Associated Engineering Limited

Description:

Complete watermain replacement, full depth replacement of asphalt surface including some base repairs, some curb replacement, and new sidewalk on Barbara St. and Killins St..

Approved Budget: $1,900,000.00

Contract Value: $1,800,000.00

Activity: None

Traffic Disruptions: None.

Public Information Drawings Download (3 MB) PDF File

Contact Us

City Hall
123 Conestoga Drive
Glasgow G1 5QH

111-222-3333
mail@example.com

Sign up to our Newsletter

Stay up to date on the city's activities, events, programs and operations by subscribing to our eNewsletters.